- Municipal Landfill Derived Biogas Purification System Process Design
- Biomass-to-Power Facility Feasibility Study and Alternatives Evaluation
- Feasibility Study for Municipal Waste to Liquid Hydrocarbons Facilities
- Biomass Gas to Liquids (Fischer-Tropsch) Facility Feasibility Study
- Independent Third-Party Design Review of New Tire Recycling Pyrolysis Plant
- Biomass to Power / Liquid Fuels Facility Feasibility Study Support
- Stranded Gas Processing Small-Scale GTL Plant Feasibility Study
- Acid/Caustic Regeneration System Preliminary Technical and Economic Evaluation
- Feasibility Study, Alternatives Evaluation and Prelim Design for Converting Batch to Continuous Oxyalkylates Resin Process
- Benzoic Acid Feasibility Study and Preliminary Plant Design
- Benzoic Acid Plant Alternatives Evaluation Study
- Rare Earth Element Extraction Process Pre-Feasibility Study
- Bentonite Plant Furnaces Gas-to-Coal Conversion Feasibility Study Development
- Study-Level Sodium Hydrosulfide Production System Process Design and Capital Cost Estimate
- Power Generation Liquid Air Energy Storage Feasibility Study
- Power Plant Di-Basic Acid Recovery System Feasibility Study
- Investor Presentation of Stranded Gas Processing Options Feasibility Study Results
- Hazardous Waste Incinerator Gas Cleaning System Upgrade Feasibility Study
- Caustic Byproduct Purification System Feasibility Study and Alternatives Evaluation
- Uranium Dissolver System Process Design for Uranium Downblending Process and Technical Training Classes