- Tire Pyrolysis Plant Troubleshooting and Process Design
- Pigment Production Consolidation Preliminary Process Design
- Polyurethane Foam Plant Blowing Agent Delivery System Preliminary Process Design
- Preliminary Process Design for the Production of Small Scale Ammonia from Natural Gas
- Scrubber Design for an Oxy-Fuel Coal Combustion Power Generation System
- Acetylene Recovery Unit Alternatives and Preliminary Process Design
- Invert Oil Hexane Separation System Process Design
- Downhole Cutting Fluids Recovery Plant Preliminary Process Design and Cost Estimation
- Caustic Byproduct Purification System Feasibility Study and Alternatives Evaluation
- Waste Treatment Facility Preliminary Process Design Review, Process Design, Computer Process Simulation, and Controls Design
- Dust Collector Evaluation and Dust Mitigation System Design
- Ammonium Hydroxide Solution Engineering Process Design
- Spray Dryer System Preliminary Process Design and Cost Estimate Preparation
- Supercritical CO2 Power Cycle Preliminary Process Design
- Rubber Recovery Plant FEL-1 Preliminary Process Design
- Chemical Production Facility Preliminary Process Design and Cost Estimates
- Preliminary Design Review and RFP Support for ANSOL Thermal Destruction Facility
- Vapor Recovery Unit Process Evaluation
- Direct Air CO2 Capture Plant Simulation and Cost Estimate
- On-Site and Remote Process Design and Engineering Plant Support
- Pigment Semi-Finishing Operation Relocation / Replacement Cost Estimate Evaluation
- Blue Pigment Process Relocation / Replacement Evaluation
- Catalytic Converter Precious Metals Recovery Plant Preliminary Process Design
- Polyester and Polyurethane Unit FEL-1 Preliminary Process Design
- Ammonia Scrubber Evaluation and Design Validation