- Biomass Gas to Liquids (Fischer-Tropsch) Facility Feasibility Study
- Industrial Vent/Gas Cleaning System Computer Process Simulation and Scrubber System Design and Specification
- Building-Wide Vent Emissions Control System Scrubber Alternatives Technical and Economic Evaluation, Process Design and Equipment Specifications Preparation, and Capital Cost Estimate Development
- Process Batch Reactors Vent Stream Control Alternatives Technical and Economic Evaluation
- Liquids Incinerator Gas Cleaning System Troubleshooting, Design and Controls Modifications Recommendations, and Modified System Startup
- Thermal Oxidizer Replacement Alternatives Screening and Technical and Economic Evaluation
- Acid/Caustic Regeneration System Preliminary Technical and Economic Evaluation
- Boiler Exhaust Gas Waste Heat Recovery Alternatives Evaluation Study
- Alternative Natural Rubber Production Pilot Plant Process Design
- Chemical Plant Wastewater Treatment Upgrade Preliminary Process Design
- Batch Reactor Cycle Time Reduction Alternatives Evaluation and Design
- Emissions Control Alternatives Technical and Economic Evaluation
- Beverage Pilot Plant Zeolite Adsorption Alternatives Evaluation, Improvements, and Design
- Steam Condensate Recovery Alternatives Evaluation
- Oxides Production Powders Handling and Processing Systems Alternatives Process Design, Evaluation, and Capital Cost Estimate
- Batch Metal Powder Production System Operational Evaluation and By-Product Reaction System Alternatives Evaluation
- Sulfuric Acid Dilution System Process Technical & Economic Alternatives Evaluation
- Specialty Metal Alloy Manufacturing Plant Wastewater Treatment System Upgrade Alternatives Evaluations
- HCl Regeneration System Alternatives Evaluation and Distillation Tower Computer Process Simulation and Design
- Greenfield Coke Plant Waste Heat Recovery System Alternatives Technical and Economic Evaluation, Process Design, Detail Design Management, and Startup
- Nuclear Research Facility Process Cooling Loops Detailed Simulation and Design, and Utilities Systems Process Design
- Research Facility Commissioning System Utilities Design
- Uranium Disposition and Thorium Extraction Facility Process Design and Cost Estimate Preparation
- Reformer Debottlenecking and Expansion Studies
- Pharmaceutical Medical Device Tinting Process Improvement Study and Alternatives Evaluation