Project Synopsis

Provide hydraulic line sizing recommendations for a coke processing plant project.

Project Summary

COKE PROCESSING PLANT COLD DUCT DESIGN

The client, a detail engineering company, was contracted by the ultimate client, a power plant technology provider, to design the cold duct system for a coke processing plant.  Part of this design was line sizing and providing appropriate pressure conditions to the downstream process; a flue gas desulfurization (FGD) system.  Process Engineering Associates, LLC (PROCESS) was subcontracted to execute this part of the project by the client.  The tasks involved in this project included:

  • Gathering data from the ultimate client and filling in holes with information from a previous project completed by PROCESS
  • Running CHEMCAD simulations to determine the duct sizes needed to supply the FGD system with appropriate requirements

The client was given a report with recommendations of sizes and an explanation of all factors that went into the simulations. The report was forwarded to the ultimate client for implementation in the plant design.

Industry Type

  • Coke Manufacturing

Utilized Skills

  • Duct hydraulic line sizing

Contact Us

Name(Required)
Email(Required)