- Independent Third-Party Design Review of New Tire Recycling Pyrolysis Plant
- Biomass-to-Power Facility Preliminary Cost Estimation
- Process Simulation for Producing Ethanol from Cellulose Feed Stocks
- Steam Condensate Recovery Alternatives Evaluation
- Sour Water Stripper Revamp Study
- Multiple Fractionation Facilities Upgrades Simulation, Preliminary Design, and Capital Cost Estimates Preparation
- Bitumen/Heavy Oil Field Upgrading System Pilot Plant
- Preliminary Process Design of an Active Pharmaceutical Ingredient Pilot-Scale Process
- Fuels Blending Facility Fume Incinerator Cost Reduction Alternatives Evaluation and Recuperative Heat Exchanger Computer Process Simulation, Design, and Specification
- Acetylene Recovery Unit Alternatives and Preliminary Process Design
- Downhole Cutting Fluids Recovery Plant Preliminary Process Design and Cost Estimation
- Biological Sludge Treatment System Computer Process Simulation, Process Design Package Preparation
- Wastewater Treatment System 93% Sulfuric Acid Usage Evaluation and FEL-0/1 Conceptual Process Design
- Modular Naphtha Processing Plant ROM Cost Estimate Development
- Chemical Production Facility Preliminary Process Design and Cost Estimates
- Blue Pigment Process Relocation / Replacement Evaluation
- Class V (FEL-1) Sulfate of Potash Process Design Package Preparation