- Environmental Permitting Assistance for New Gasification Plant
- Scrubber Systems Computer Process Simulation, Operational Evaluation and Air Permitting Assistance
- Title V Air Permit Renewal Process Engineering Support
- Waste Plastic Pyrolysis Based Synthetic Crude Process Design
- Preliminary Design of a Biodiesel Glycerin/Methanol Batch Refining Process
- Tank Farm VOC Emissions Control System Alternatives Evaluation
- Batch Reactor Vent Stream Flowrate and Composition Characterization
- Specialty Chemicals Facility FEL-1 Batch Nutraceutical Intermediates Production Line Expansion
- Chemical Manufacturing R&D Facility Thermal Oxidizer Evaluation and Modified System Process Design
- FEL-1 Preliminary Design Package for a New Colloidal Silica Plant
- Agricultural Super-Absorbent Plant Scale-Up Design from Demonstration Size to Commercial Size
- Boron Scrubber Detailed Process Engineering Support
- Pilot-Scale Flame Salt Encapsulation System Process Design
- Process Design Package for a Specialty Metals Production Facility Expansion
- Metal Flame Salt Encapsulation Pilot System Front-End Engineering Design (FEED)
- New Catalyst Plant Nitrogen Oxides ( NOx) Scrubber and Stack Evaluations
- HF and HNO3 Acid Vapor Emissions Estimating for a Metals Cleaning and Etching Operation
- Catalyst Manufacturing Facility NOX Scrubbing System Evaluation and Troubleshooting
- Nitrogen Oxides (NOX) Scrubbing Technical and Economic Alternatives Evaluation
- Industrial Waste Water Plant Design, Pilot Program, and Commissioning
- HCL and HNO3 Acid Gas Scrubber Improvements
- Catalyst Production Facility Major Expansion FEL-2 Process Design and Cost Estimate
- Aluminum Production Facility Wastewater Treatment Upgrade Preliminary Design
- Catalyst Manufacturing Copper Stripping Process Technical Alternatives Evaluation
- Flare Stack Replacement and Relocation Study