- Municipal Water Treatment Plant Capacity Upgrade Evaluation
- Chemical Manufacturing Facility Wastewater Treatment System Upgrade Evaluation, FEL-1 and Cost Estimating
- Process Dust Collector Evaluation and Design
- Spray Dryer System Preliminary Process Design and Cost Estimate Preparation
- Wastewater Treatment System 93% Sulfuric Acid Usage Evaluation and FEL-0/1 Conceptual Process Design
- Supercritical CO2 Power Cycle Preliminary Process Design
- Rubber Recovery Plant FEL-1 Preliminary Process Design
- Refinery Strategic Optimization Project Support
- Transuranic Liquid Waste Treatment Demonstration Conceptual Design
- Crude Distillation Unit Simulation Support
- Crude Distillation Unit Process Simulation
- Modular Naphtha Processing Plant ROM Cost Estimate Development
- Chemical Production Facility Preliminary Process Design and Cost Estimates
- Refinery Hydrogen Recovery FEL-1 Process Design
- Army Base Pollution Prevention Plan Support and Preparation
- Copper De-Tinning Process Evaluation
- Vapor Recovery Unit Process Evaluation
- Catalytic Converter Precious Metals Recovery Plant Process Design
- Direct Air CO2 Capture Plant Simulation and Cost Estimate
- On-Site and Remote Process Design and Engineering Plant Support
- Pigment Semi-Finishing Operation Relocation / Replacement Cost Estimate Evaluation
- Blue Pigment Process Relocation / Replacement Evaluation
- Pigments Production Expansion / Relocation Process Design and Cost Estimate
- Catalytic Converter Precious Metals Recovery Plant Preliminary Process Design
- Polyester and Polyurethane Unit FEL-1 Preliminary Process Design