- Flare Location Review at a Gas Pipeline Terminal Facility
- Pipeline Truck Loading Station Engineering and Regulatory Compliance Support
- Power Plant CO2 Capture Pilot-Plant Design
- Spray Dryer Scrubber Air Line Simulation and Sizing
- Scrubber Design for an Oxy-Fuel Coal Combustion Power Generation System
- Semiconductor Hazardous Gas Filling Plant Design
- Hazardous Waste Incinerator Gas Cleaning System Upgrade Feasibility Study
- Hazardous Waste Incineration Facility Air Pollution Controls (APC) Simulation
- Catalytic Extraction Waste Treatment Facility Product Slurry/Reaction System Process Design Package Preparation
- Waste Treatment Facility Preliminary Process Design Review, Process Design, Computer Process Simulation, and Controls Design
- Waste Treatment Facility-Wide Detail Design Review
- Modeling and Simulation of Contaminated Soils/Solids Thermal Desorption and Gas Cleaning Systems
- Municipal Water Treatment Plant Capacity Upgrade Evaluation
- Wastewater Treatment Facility Operational Evaluation
- Process Dust Collector Evaluation and Design
- Dust Collector Evaluation and Dust Mitigation System Design
- Partial Condenser Cooling System Process Design
- Spray Dryer System Preliminary Process Design and Cost Estimate Preparation
- Carbon Adsorber Regeneration System Evaluation
- Gas-Fired Equipment Control Tuning Review and Improvements
- NO2 Emissions Mitigation Technical and Economic Evaluation
- Wastewater Treatment System TDS Reduction Alternatives Evaluation
- Caustic Scrubber Optimization for HCL Removal
- Chemical Facility Pigment Reactor System Upgrades Design
- Petroleum Refinery Boiler Control System Assessment and Tuning