- Supercritical CO2 Power Cycle Preliminary Process Design
- Rubber Recovery Plant FEL-1 Preliminary Process Design
- Sweetener Toll Processor Facility Suitability Evaluation
- Refinery Strategic Optimization Project Support
- MSW-Fired Electrical Generation Unit FEL-2 Process Design
- Crude Distillation Unit Process Simulation
- Modular Naphtha Processing Plant ROM Cost Estimate Development
- Wastewater Treatment System TDS Reduction Alternatives Evaluation
- Chemical Production Facility Preliminary Process Design and Cost Estimates
- Polyol Facility FEL-2.5 Process Design
- Crude Distillation Unit Process Configuration Review
- Army Base Pollution Prevention Plan Support and Preparation
- Low-Level Rad Waste Pilot-Plant Test Support for Removing Cesium
- Ground Water Remediation Facilities Design Authority Engineering Support
- Crude Distillation Unit Process Simulation
- Catalytic Converter Precious Metals Recovery Plant Process Design
- Direct Air CO2 Capture Plant Simulation and Cost Estimate
- On-Site and Remote Process Design and Engineering Plant Support
- Pigment Semi-Finishing Operation Relocation / Replacement Cost Estimate Evaluation
- Blue Pigment Process Relocation / Replacement Evaluation
- Pigments Production Expansion / Relocation Process Design and Cost Estimate
- Catalytic Converter Precious Metals Recovery Plant Preliminary Process Design
- Polyester and Polyurethane Unit FEL-1 Preliminary Process Design
- Class V (FEL-1) Sulfate of Potash Process Design Package Preparation
- Magnesium Pilot Plant Process Design (FEL-3) and Support